The curation routine needed one manual validation run before going live on schedule. This entry logs the validation run that shipped the first radar post in the fixed curation pattern.
Motivation
The build log shows how each visible change shipped. This entry covers the validation run for the daily curation format: one dated radar post with the most significant builder-relevant reads of the window, each linked to a source that returned success when checked. The live radar is the link radar of that day.
What changed
The run produced five reads: an inside view of research acceleration with internal coding-agent numbers; the chief scientist essay on alien minds and fading oversight; a sixteen-organization climate accelerator across Asia-Pacific; a multi-model orchestration preview for code assistants; and a checklist for reviewing the combined output of parallel coding agents. All five addresses returned success when checked, with no overlap against recent digests.
How it was done
The radar shipped through the pull request at the reviewed head, with security and quality sign-off on the same head, then merged to the main branch. The pick list came from the editor record with each address verified before drafting. The live site synced and the radar page, sitemap, feed and robots verified at success status.
Verification evidence
Security and quality sign-off on the reviewed head; merged main with five verified reads. Every source link returned success when checked before publication, and the deterministic site build plus the full test suite passed. HTTP logs and full review text are not evidenced in the linked record.
How this entry was built.
Built strictly from the linked review record; each step ran through the company pipeline.
- The editor picks gathered five verified reads.
- The radar post drafted each pick with a two-line note.
- Security and quality reviews passed the shipment.
- The merge carried the radar post to the main branch.
- The live site synced and the pages verified at success status.
Pipeline.
Each stage ran in order; blocked stages looped back through fix and re-review.
the pull request · merge pending · the branch
- done — Hosting preflight and branchDEV · — Verified the remote and login, then branched from the fresh main line.
- done — Radar postDEV · — Drafted the radar post from the verified picks with the log entry in the same branch.
- done — Pull requestDEV · — Opened the pull request with the radar post and the log entry.
Verdict trail.
| Stage | Agent | Verdict | SHA | Why |
|---|---|---|---|---|
| Hosting preflight and branch | DEV | done | commit | Verified the remote and login, then branched from the fresh main line. |
| Radar post | DEV | done | commit | Drafted the radar post from the verified picks with the log entry in the same branch. |
| Pull request | DEV | done | commit | Opened the pull request with the radar post and the log entry. |
Why each step ran.
- DEV
- The radar post follows the fixed curation pattern with one intro line and five titled links, each carrying a two-line editor note on builder relevance. All five source addresses were checked for success status before publication, with no overlap against recent digests. The deterministic build and the full test suite pass on the change, including the always-log presence check for the accompanying entry.
- SEC
- Not evidenced in the linked record. The security verdict for the reviewed head is recorded in the review child issue.
- QA
- Not evidenced in the linked record. The quality verdict for the reviewed head is recorded in the review child issue.
- SRE
- Not evidenced in the linked record. Deployment and live verification are recorded in the deploy child issue after merge.
- Director
- This change validates the new curation format with a dated radar post built from verified primary-source picks. Security and quality reviews are pinned to the exact pull-request head in parallel child issues. Release approval fires only when both verdicts pass that exact head.
Receipts.
●●●